Highlights of Project Executed

Welding of 30" dia 3 LPE coated Pipe Fit up and Welding inculding NDT - Jaigarh Dabhol Pipeline Project

Ratnagiri, Maharashtra

Client Western Concessions Private Limited / H Energy
Contractor Param Offshore Services Pvt. Ltd
Scope Of Work Mainline Welding for Jaigarh Dabhol project - Welding of 30" dia 3 LPE coated Pipe Fit up and Welding inculding NDT
Duration 210 Days
Location Ratnagiri, Maharashtra
Value 3.80 Cr
Actual Completion 210 Days

Stringing Activiites For Jaigarh Dabhol Pipeline Early Production Facilities.

Ratnagiri, Maharashtra

Client Western Concessions Private Limited / H Energy
Contractor Param Offshore Services Pvt. Ltd
Scope Of Work Mainline Stringing Activiites For Jaigarh Dabhol Pipeline Early Production Facilities
Duration 42 Days
Location Ratnagiri, Maharashtra
Value 0.82 Cr
Actual Completion 42 Days

Fabrication of 200 MT Jacket/Template (Drilling Jacket) - Reliance Sikka Ports & Terminals Ltd. Berth A2 Project

Bedi Port, Gujrat

Client ONGC
Contractor Sapura Engineering & Construction (India) Pvt. Ltd.
Sub Contractor Param Offshore Services Pvt. Ltd
Scope Of Work Fabrication of 200 MT Jacket/Template (Drilling Jacket) at Bedi Port, Jamnagar
Duration 90 Days
Location Bedi Port, Gujrat
Value 1.77 Cr
Actual Completion 90 Days

Loadout of Concrete Mattress and Sea Fastening & Lashing Daman Development Projects

Mumbai Port

Client ONGC
Contractor KREUZ SUBSEA PTE LTD.
Sub Contractor Param Offshore Services Pvt. Ltd
Scope Of Work Supporting Team and Crane for loadout I, II, III & IV of Concrete Mattress and Sea Fastening & Lashing for Daman Development Project
Duration 120 Days
Location Mumbai Port
Value 0.24 Cr
Actual Completion 120 Days

Fabrication of DP BUOYS For PRP IV & Daman Development Projects

Param Yard, Chirle

Client ONGC
Contractor KREUZ SUBSEA PTE LTD.
Sub Contractor Param Offshore Services Pvt. Ltd
Scope Of Work DP Buoy Fabrication, NDT and Primer Painting (09 NOS)
Duration 29 Days
Location Kreuz Glorious & Kreuz Supporter
Value 0.63 Cr
Actual Completion 29 Days

Load Out and Sea Fastening Of Reels for PRP-IV

PNV CHANNEL (BARGE SAGAR 300)

Client ONGC
Contractor L & T Hydrocarbon Engineering Limited
Sub Contractor Param Offshore Services Pvt. Ltd
Scope Loading of flexible reels, ballasting of barge, fabrication and welding of pad eye & sea fastening & lashing of 10 nos. NKT reels for balance work
Duration 07 Days
Location PNV CHANNEL BARGE SAGAR 300
Value 0.24 Cr
Actual Completion 07 Days

Fabrication & Installation Of Mezzanine Deck

PARAM YARD, CHIRLE & MUMBAI PORT

Client ONGC
Contractor KREUZ SUBSEA PTE LTD.
Sub Contractor Param Offshore Services Pvt. Ltd
Scope Fabrication of Mezzanine Deck, Installation Of Mezzanine Deck for LARS System and Extra Deck Extension, Load Test For LARS System And Loading & Sea Fastening of Narmada Equipment and LARS System with Raw Material
Duration 30 days
Location PARAM YARD, CHIRLE & MUMBAI PORT
Value 0.50 Cr
Actual Completion 30 Days

Installation of Bridge 900 (MT) for RO RO Ferry Terminal

Dahej - Gujarat

Client Gujarat Maritime Board
Contractor Essar Projects India Limited
Sub Contractor Param Offshore Services Pvt. Ltd.
Scope Providing supporting team for installation of bridge 900 (MT) for RO RO Ferry Terminal
Duration 30 days
Location Dahej - Gujarat
Value 0.37 Cr
Actual Completion 30 days

Mumbai High South Field Re – Development Phase – III

Barge Sea Jaguar - Offshore

Client ONGC
Contractor SapuraKencana HL SDN, BHD
Sub Contractor OHCS India Pvt. Ltd./ Param Offshore Services Pvt. Ltd.
Scope Of Work Topside Hookup, Modification and Pre - Commissioning of 9 Well Head & Process Platform
Duration 210 Days
Location Mumbai High South Field
Value 5.9 Cr.
Actual Completion 210 days

Mumbai High South Field Re – Development Phase – III

Fabrication at Water Front – Belapur Terminal, Reti Bander, Navi Mumbai.

Client ONGC
Contractor SapuraKencana HL SDN, BHD
Sub Contractor OHCS India Pvt. Ltd./ Param Offshore Services Pvt. Ltd.
Scope Fabrication of Riser Protector, Clamp, J Tube Fabrication and Sub Sea Structure
Duration 90 Days
Location Water Front – Belapur Terminal
Value 3.5 Cr
Actual Completion 80 Days

Life Extension & Capacity Up-Gradation of GT-1 & 2

Location: ONGC Uran Terminal-Raighar

Client ONGC
Contractor Brush / Micronel
Sub Contractor Param Offshore Services Pvt. Ltd.
Scope Replacement of Stator, Rotor and Control Panel with Line Cube / Neutral Cube & Pre - Commissioning
Duration 84 Days
Location ONGC Uran Terminal-Raighar
Value 0.71 Cr
Actual Completion 59 Days

Mumbai High South Field Re – Development Phase – III

Fabrication at Water Front – Belapur Terminal, Reti Bander, Navi Mumbai.

Client ONGC
Contractor SapuraKencana HL SDN, BHD
Sub Contractor OHCS India Pvt. Ltd./ Param Offshore Services Pvt. Ltd.
Scope Fabrication of Conductor Protector, Conductor Pipe and Sub Sea Clamp
Duration 60 days
Location Water Front – Belapur Terminal
Value 1.22 Cr
Actual Completion 55 days

Mumbai High North Field - III

Location: Kruez Supporter / Regina 250

Client ONGC
Contractor Supreme Offshore
Sub Contractor Param Offshore Services Pvt. Ltd.
Scope Top side Modification Of NR & LA Platform
Duration 51 Days
Location Bombay High North
Value 0.80 Cr
Actual Completion 49 Days

Mangalore Refinery Pipe Line

Location – Mangalore - LFP

Client ONGC
Contractor Leighton Welspun Contractors India Pvt. Ltd.
Sub Contractor Param Offshore Services Pvt. Ltd.
Scope Installation of Onshore Pipe Line & Tie – In Joint with Offshore Line
Duration 50 days
Location Mangalore
Value 0.86 Cr
Actual Completion 48 days

IOCL Paradip Boot Refinery

Location – Paradip Terminal

Client IOCL
Contractor Stewarts And Lloyds Of India Ltd.
Sub Contractor Param Offshore Services Pvt. Ltd.
Scope Pipe Laying / Hook-Up / Joint Coating / Testing / Pre - Commissioning.
Duration 160 days
Location Mangalore
Value 2.32 Cr
Actual Completion 160 days

IOCL 64” Storm Water Pipeline Out Fall To Sea

Location – IOCL Paradip - Orissa

Client IOCL
Contractor Leighton Welspun Contractors India Pvt. Ltd
Sub Contractor Param Offshore Services Pvt. Ltd.
Scope Supply of Manpower, Construction Equipment, Labour Camp, Temporary Working Area, Hospitality Services for Officer & Labour, Security for men & material. Pipe Line Laying & Pre-Commissioning
Duration 160 days
Location Pradeep - Orissa
Value 3.88 Cr
Actual Completion 160 days

IOCL 64” Storm water pipe line: Diffuser Cage Fabrication

Location – IOCL Paradip Orissa

Client IOCL
Contractor Leighton Welspun Contractors India Pvt. Ltd
Sub Contractor Param Offshore Services Pvt. Ltd.
Scope Fabrication of Diffuser Cage at Site Paradip
Duration 30 days
Location IOCL Paradip Orissa
Value 0.55 Cr
Actual Completion 30 days

Neelam Heera Re – Construction

Location – Offshore – Barge Sea Scanley-I & Barge Ocean - III

Client ONGC
Contractor ESSAR / DAS Offshore
Sub Contractor Param Offshore Services Pvt. Ltd.
Scope Offshore Fabrication, Installation, Hydrotest, Scaffolding, Pre - Commissioning & Commissioning at Neelam & Heera Process Platform
Duration 300 days
Location Offshore + Hazira
Value 6.18 Cr
Actual Completion 300 days

BG HYDRA

Location – Pipava Port

Client British Gas
Contractor Swiber
Sub Contractor Param Offshore Services Pvt. Ltd.
Scope Mud Matt Installation, Inspection of Jacket, Riser Hydro Testing and Reinforcement Ring Welding
Duration 11 days
Location Pipava Port
Value 1 CR
Actual Completion 10 days

Leighton: J tube I Tube Fabrication

Location – Mundra Port

Client ONGC
Contractor Leighton Welspun Contractors India Pvt. Ltd
Sub Contractor Param Offshore Services Pvt. Ltd
Scope Fabrication of J Tube / I Tube
Duration 45 days
Location Mundra Port
Value 0.50 Cr
Actual Completion 45 days

PARAM OFFSHORE SERVICES PVT. LTD.