Past Projects

Sr. No. Name of the Project Name of Clients Scope of Work
01 Daman Re Development Project Kreuz Subsea Fabrication of Dp Buoy,Bare Clamp, Lifting Clamp, Stopper Clamp, Knee Brace Clamp, Lifting Frame, 24" SSIV & 12" Lateral Spool. Fabrication of Mezzanione Deck, Installation of Mezzanine Deck for LARS System & Extra Deck Extension, Load Test for LARS System. Supply of skilled manpower for offshore job
02 Pipe Replacement Project IV Kreuz Subsea Fabrication of DP Buoys, Padeye, CHUTE, Zodiac Cradle, Grasshopper And HAUL Frame for kreuz glorious,. Supply of skilled manpower for offshore job
03 Pipe Replacement Project IV L & T HYDROCARBON ENGINEERING LIMITED Load Out And Sea Fastening Of REELS For PRP IV Project ( Fabricaiton fo Padeye, Stopper Plate, Dock Cleats, Loading of Flexible REELS, Ballasting of Barge Sagar 250, Welding of Padeye & Sea Fastening & Lashng of10 Nos. NKT REELS for Balance Work)
04 Marine Loading Arms OFFSHORE INFRA STRUCTURES Supporting Team For Erection, Installation & Pre Commisioning of Marine Loading Arms Along with Base Riser at Ratnagiri (Jaighad)
05 B – 127 – Top Side Modification at Offshore Sapurakencana HL Sdn Bhd Supply of crane and manpower at Mumbai Port, Provision of Warehouse
06 RO RO Ferry Terminal Essar Projects India Ltd. Providing supporting team for installation of bridge 900 (MT) for RO Ro Ferry Terminal
07 Mumbai High South Field RE-Development Phase-III SapuraKencana HL SDN BHD Topside Hookup, Modification and Pre-Commissioning of 9 Well Head & Process Platform
08 Mumbai High South Field Re – Development Phase – III SapuraKencana HL SDN, BHD Fabrication of Riser Protector, Clamp, J Tube Fabrication and Sub Sea Structure
09 Life Extension & Capacity Up-Gradation of GT-1 & 2 Brush / Micronel Global Engineering Pvt. Ltd. Replacement of Stator, Rotor and Control Panel with Line Cube / Neutral Cube & Pre-Commissioning
10 Mumbai High North Field Re – Development Phase - III Supreme Offshore Construction & Technical Services Ltd. Top side Modification Of NR & LA Platform
11 Mumbai High South Field Re – Development Phase - III SapuraKencana HL SDN BHD Fabrication of Conductor Protector, Conductor Pipe and Sub Sea Clamp
12 IOCL Paradip Boot Refinery Stewarts And Lloyds Of India Ltd. Pipe laying /Hook-up/ Joint Coating / Testing / Pre - Commissioning.
13 Mangalore Refinery Pipe Line Leighton Welspun Contractors India Pvt. Ltd Installation of Onshore Pipe Line & Tie – In Joint with Offshore Line
14 IOCL 64” Storm Water Pipeline Out Fall To Sea Leighton Welspun Contractors India Pvt. Ltd Supply of Manpower, Construction Equipment, Labour Camp, Temporary Working Area, Hospitality Services for Officer & Labour, Security for Men & Material. Pipe Line Laying & Pre-Commissioning
15 Pipe Replacement Project – III Leighton Welspun Contractors India Pvt. Ltd Supply of Manpower, Construction Equipment, for Pipe Laying Barge, I / J Tube fabrication & Assembly, Painting & Coating, Hook – Up & Pre – Commissioning.
16 SPM and Plem Installation Work ESSAR Project Supply of Manpower, Construction Equipment and Consumables for Installation of SPM and Plem at Barge Nand Gaurav
17 Sea Trail of 12" Pipe Line Laying and Recovery ESSAR Project Supply of Manpower, Construction Equipment and Consumables for Sea Trail of 12" Pipe Line Laying and recovery at Barge Nand Gaurav
18 Modification of Barge Nand Gaurav ESSAR Offshore SubSea Ltd. Supply of Manpower, Construction Equipment and Consumables for Relocation of Laying Equipment, Installation of Horizontal and Vertical Sheeve, Stinger Modification and Installation at barge Nand Gaurav
19 Pipe Replacement Project – II Leighton Welspun Contractors India Pvt. Ltd Supply of Manpower, Construction Equipment, for Pipe Laying Barge, I / J Tube fabrication & Assembly, Painting & Coating, Hook – Up & Pre – Commissioning.
20 IOCL 64” Storm water pipe line: Diffuser Cage Fabrication Leighton Welspun Contractors India Pvt. Ltd Fabrication of Diffuser Cage at Site Paradip
21 Neelam Heera Re – Reconstruction Project Das Offshore Eng. Pvt. Ltd. Fabrication of SS Piping & Testing at Hazira Yard
22 Neelam Heera Re – Reconstruction Project Das Offshore Eng. Pvt. Ltd. Offshore Fabrication, Installation, Hydrotest, Scaffolding, Pre - Commissioning & Commissioning at Neelam & Heera Process Platform.
23 BG Hydra Jacket SWP Recovery Swiber Offshore Mud Matt Installation, Inspection of Jacket, Riser Hydro Testing and Reinforcement Ring Welding

PARAM OFFSHORE SERVICES PVT. LTD.

© 2017 | All Rights Reserved

Quick Contact